FAÇADE CLADDING WALKER STREET, NORTH SYDNEY

Client:


Strata Plan 50411

Service:

Full Façade Refurbishment

Access:

Mast Climber

Rope Access

The owners of Strata Plan 50411 engaged Magellan to carry out the removal of the entire tiled façade to each elevation and install a new aluminum composite façade to give the building a new modern look. Magellan’s team worked closely with the local council, external engineers and the client to deliver this brilliant transformation.

Additional works were required to treat and rectify widespread concrete spalling affecting the structural columns. This required special handling and monitoring to ensure asbestos materials contained within the building structure was not disturbed

The specific components of the project were;

  • Removal of the tiled outer façade and bedding material to each facade
  • Removal of concrete spalling
  • Treatment of exposed steel reinforcement to engineers standards
  • Reinstatement of over 8000 litres of concrete to the façade
  • Installation of aluminum composite cladding to each elevation from the ground up.
  • Additional works required to reattach the full height glazing panels to the façade
  • Reforming the front entrance with new planter box and tiled to match the existing travertine
  • Rejuvenation and restoration of the existing floor tiles to foyer entrance with new grouting sealer
NEWS & UPDATES
Aenean dapibus a odio eget blandit
July 17, 2018
Lorem ipsum dolor sit amet, consectetur adipiscing elit
July 17, 2018
WHY PREVENTIVE BUILDING MAINTENANCE IS IMPORTANT
May 11, 2018
WORKING AT HEIGHTS: WHY CERTIFICATION OF HEIGHT SAFETY SYSTEMS MATTERS
May 11, 2018
WATER LEAKAGES IN HIGH-RISE BUILDINGS: AVOID COSTLY DAMAGE REPAIRS
May 11, 2018

MARULIE DULAY, PREMIUM STRATA

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.

JAMES HILEY, PROBUILD

Due to the complex nature of the works Magellan were required to satisfy and communicate with multiple stakeholders to ensure the works were completed in the required time periods and durations.

The Probuild Greenland Centre Sydney team has no hesitation with recommending Magellan Company for ay future projects or opportunities.

PATRICK FAHEY, SENIOR HSE COORDINATOR, BUILDCORP

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.