PROMONTORY APARTMENTS POINT STREET PYRMONT

Client:


Promontory Apartments

Service:

Protective Coating and Rust Prevention

Application of Epoxy Paint System Comprising 4 Coat Process

Access:

Rope Access

Inspection of balustrades showed widespread failed and peeling paint due to poor application of the original coating. The majority of balustrades suffered corrosion, requiring full treatment and repainting with specialized industrial epoxy coatings. Over 1100 posts required cleaning and rust removal and preparation for painting. Application of two pack epoxy primer was applied, Two coats of metal protection coating to meet the manufacturers specifications followed by a colored two pack epoxy top coat.

The specific components of the project were;

  • Removal of defective coatings back to bare steel.
  • Clean and preparation of balustrades from all corrosion.
  • Application of two pack epoxy industrial strength protective coating.
  • 4 Coat paint system applied to exacting standards and film thickness
  • Continued testing of treated areas with digital equipment ensuring a high standard of workmanship was maintained.
  • Application of colored two pack epoxy paint as selected by the client.
NEWS & UPDATES
Aenean dapibus a odio eget blandit
July 17, 2018
Lorem ipsum dolor sit amet, consectetur adipiscing elit
July 17, 2018
WHY PREVENTIVE BUILDING MAINTENANCE IS IMPORTANT
May 11, 2018
WORKING AT HEIGHTS: WHY CERTIFICATION OF HEIGHT SAFETY SYSTEMS MATTERS
May 11, 2018
WATER LEAKAGES IN HIGH-RISE BUILDINGS: AVOID COSTLY DAMAGE REPAIRS
May 11, 2018

MARULIE DULAY, PREMIUM STRATA

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.

JAMES HILEY, PROBUILD

Due to the complex nature of the works Magellan were required to satisfy and communicate with multiple stakeholders to ensure the works were completed in the required time periods and durations.

The Probuild Greenland Centre Sydney team has no hesitation with recommending Magellan Company for ay future projects or opportunities.

PATRICK FAHEY, SENIOR HSE COORDINATOR, BUILDCORP

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.