RAPTOR RAIL ELIZABETH STREET, SYDNEY

Client:


FDC Constructions & Fitout Pty Ltd

Service:

Installation of multiple overhead monorail systems across different levels

Access:

Elevated Work Platforms required for installation process

The System
The installation of a High Access System was required to provide for both the internal cleaning of high glass and for access in conducting service maintenance of the suspended lighting system above the escalators of the main foyer and entrance of the Navitas building at 255 Elizabeth Street, Sydney.

The monorails had to be positioned precisely between the rows of lighting and suspended from the soffit to sit as close as possible to the top of the lights to enable services to be conducted. In addition to this, the monorails system and support structures are exposed and painted white to keep in style with the industrial finish of the concrete ceiling and exposed services.

The Equipment
The system comprises 3 individual Raptor type monorails over level 3 with 1 overhead fall arrest anchor point at entry point providing safety at transition onto the system. 3 more individual Raptor type monorails continue over level 2 which are accessed from the system above. Each monorail is equipped with 4 rolling trolleys enabling two servicemen to conduct works at all times.

NEWS & UPDATES
Aenean dapibus a odio eget blandit
July 17, 2018
Lorem ipsum dolor sit amet, consectetur adipiscing elit
July 17, 2018
WHY PREVENTIVE BUILDING MAINTENANCE IS IMPORTANT
May 11, 2018
WORKING AT HEIGHTS: WHY CERTIFICATION OF HEIGHT SAFETY SYSTEMS MATTERS
May 11, 2018
WATER LEAKAGES IN HIGH-RISE BUILDINGS: AVOID COSTLY DAMAGE REPAIRS
May 11, 2018

MARULIE DULAY, PREMIUM STRATA

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.

JAMES HILEY, PROBUILD

Due to the complex nature of the works Magellan were required to satisfy and communicate with multiple stakeholders to ensure the works were completed in the required time periods and durations.

The Probuild Greenland Centre Sydney team has no hesitation with recommending Magellan Company for ay future projects or opportunities.

PATRICK FAHEY, SENIOR HSE COORDINATOR, BUILDCORP

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.