Installation of illuminated signs and static acrylic lettering and logos to various building facades. Access via crane requires specific skill and knowledge to ensure a smooth operation and efficiency. Magellan worked alongside the developer on site who provided access to the crane. Our in-house WHS and operative procedures ensured all process around these works were approved by the developer and gave them assurance and the confidence in Magellan to carry out this work on their behalf right from the outset.

The specific components of the project were;

  • Preparation of safe work method statements and onsite safety procedures.
  • Install chemically anchored fixings to the façade to support the signage
  • Installation of illuminated signage and static acrylic lettering and logos to building façade.
  • Works coordinated with other onsite services.
  • Working alongside crane operators to suit their requirements and timeline
  • Installation and commissioning of LED wiring.

 

  • Façade signgae installed with crane access by Magellan's team
  • Men on Rope Installing Window Walls In A High Rise Building - Rope Acess Sydney - Magellan Company
NEWS & UPDATES
Brick Facade Cleaning
October 20, 2022
Branding for special event
September 7, 2022
Iconic Banner Install
August 24, 2022
Facade Painting
August 1, 2022
Height Safety
July 24, 2022

MARULIE DULAY, PREMIUM STRATA

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.

JAMES HILEY, PROBUILD

Due to the complex nature of the works Magellan were required to satisfy and communicate with multiple stakeholders to ensure the works were completed in the required time periods and durations.

The Probuild Greenland Centre Sydney team has no hesitation with recommending Magellan Company for ay future projects or opportunities.

PATRICK FAHEY, SENIOR HSE COORDINATOR, BUILDCORP

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.