Inspection of balustrades showed widespread failed and peeling paint due to poor application of the original coating. The majority of balustrades suffered corrosion, requiring full treatment and repainting with specialized industrial epoxy coatings. Over 1100 posts required cleaning and rust removal and preparation for painting. Application of two pack epoxy primer was applied, Two coats of metal protection coating to meet the manufacturers specifications followed by a colored two pack epoxy top coat.

The specific components of the project were;

  • Removal of defective coatings back to bare steel.
  • Clean and preparation of balustrades from all corrosion.
  • Application of two pack epoxy industrial strength protective coating.
  • 4 Coat paint system applied to exacting standards and film thickness
  • Continued testing of treated areas with digital equipment ensuring a high standard of workmanship was maintained.
  • Application of colored two pack epoxy paint as selected by the client.
  • Glass Balcony At Promontory Apartments - Building Facade - Magellan Company
  • Rusted Steel Balcony At Promontory Apartments - Abseiling Sydney - Magellan Company
  • Waterproofing and make-good are core services at Magellan Rope Access
NEWS & UPDATES
Brick Facade Cleaning
October 20, 2022
Branding for special event
September 7, 2022
Iconic Banner Install
August 24, 2022
Facade Painting
August 1, 2022
Height Safety
July 24, 2022

MARULIE DULAY, PREMIUM STRATA

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.

JAMES HILEY, PROBUILD

Due to the complex nature of the works Magellan were required to satisfy and communicate with multiple stakeholders to ensure the works were completed in the required time periods and durations.

The Probuild Greenland Centre Sydney team has no hesitation with recommending Magellan Company for ay future projects or opportunities.

PATRICK FAHEY, SENIOR HSE COORDINATOR, BUILDCORP

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.