P7 CARPARK SYDNEY KINGSFORD SMITH INTERNATIONAL AIRPORT

Client:


Wide Open Platform

Service:

Façade Signage

Access:

Abseil & Elevated Work Platform

Installation of banner signage to carpark facade. Access via abseil and internal structure this requires specific skill and knowledge to ensure a smooth operation and efficiency. Our in house WHS and operative procedures ensured all process around these works were approved by the airport WHS and gave them assurance and the confidence in Magellan to carry out this work on their behalf right from the outset.

The specific components of the project were;

  • Installation of 100m x25m in 5 pieces
  • Banner weight is approximately 700-800kg.
  • Airport curfew means that the banners can only be installed between 11pm – 3am resulting in the installation being extremely time sensitive with weather past and future needing to be assessed.
  • banner being of a Fox mesh sub straight with 5 conjoining panels all joined together with industrial zippers.
  • Magellan work both printer, production and site owners to achieve a premium result.
  • All safety paperwork and safe work method statements and sops developed by Magellan company with approval from all governing bodies from Sydney international airport.
  • High Rise Building Signage - Height Safety Services - Magellan Company
  • Large Signage On The Carpark - Cladding Installation - Magellan Company
  • Mustang Banner - Facade Services - Magellan Company
  • Mustang Banner At The Carpark - Concrete Restoration - Magellan Company
NEWS & UPDATES
Brick Facade Cleaning
October 20, 2022
Branding for special event
September 7, 2022
Iconic Banner Install
August 24, 2022
Facade Painting
August 1, 2022
Height Safety
July 24, 2022

MARULIE DULAY, PREMIUM STRATA

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.

JAMES HILEY, PROBUILD

Due to the complex nature of the works Magellan were required to satisfy and communicate with multiple stakeholders to ensure the works were completed in the required time periods and durations.

The Probuild Greenland Centre Sydney team has no hesitation with recommending Magellan Company for ay future projects or opportunities.

PATRICK FAHEY, SENIOR HSE COORDINATOR, BUILDCORP

From a safety perspective the two guys you had here installing the crosses and signage on St Vincent’s Hospital were excellent. The boys were well mannered and took safety seriously. I completed an internal Safe Work Method Statement Compliance Audit on their works; they scored 100% which is what we want to see here at Buildcorp.